------------------ Sarawak Malaysia ------------------ 3-year project Phase 1 Installation and Configuration - Migration of exiting data from PQView 4 to PQD - Setup of mirror server - PQ Digest Development of vendor protocols - Integration of the following meter types: - Dranetz Encore Series 61000 - Schneider PowerLogic ION 8800 - Electro Industries/GaugeTech Nexus 1500+ (preferably not via PQDIF - slow) - Secure Meters ProQ 100 - Unipower AB UP-2210R - https://www.qualitrolcorp.com/products/fault-recorders/qualitrol-multifunction-power-system-monitor/ - Integration with lightning detection network system (LINET) by nowcast for real-time lightning detection data Phase 2 Implementation of the capacitor bank switching assessment module Fault cause analytics full list - animal crossing? - accuracy of fault causes; case studies? - lightning arrester failure of particular interest References Renewable energy - potential failures?